The key to success for any construction business is to have
successful logistics management, be it large or small. The first thing that
stakeholders check in to is the logistics team because nobody would want their
goods to be damaged, there it is paramount to have to have a good professional
image made and maintained to be successful. Studies in logistic management have
suggested that the productivity gains can be achieved if the construction
processes are planned from logistics perspective. To plan construction
logistics it is required to have proper and accurate scheduling of materials
that have to be delivered according to the requirement that has been laid down
by the people who are being served. Supply chain plays an important role in
this as well so does store management. Those who are associated with construction site logistics will need to ensure that
they successfully manage the movement of workforce, equipment and goods at the
construction site.
They would
also need to control site facilities management. Construction site logistics
ensures that the entire construction team remains alert of all the logistics
activity going on. Construction site logistics covers many important roles.
First and the foremost is planning and programming. This implies that it takes
control of loading site set-up for the movement of the plant, labours and
materials efficiently around the site. To achieve this purpose it has to be
involved in hoarding, site accommodation, gates, hoists, temporary services,
security, and catering, material delivery along with a waste management
strategy. It also means planning the internal and external logistics routes.
These routes need to be planned through a focus on the separation of the
workforce, vehicles and machinery. Also, the use of the key assets needs to be
pre-planned. Often waste becomes a problem so it has to be given extra
attention. Another important aspect of Construction site logistics is the
supply chain management.
This
responsibility includes managing the characteristics of the sites, these are
the access to the site, arranging by programs, cranes, hoists and labour, and
storage capacity. Movement plans need to be made on daily, weekly and long term
basis. The procurement of arrangements needs to be understood. Material moving
in and out of the site needs to be controlled and properly checked.
Construction site logistics assists in evaluating the potential logistic
suppliers along with the appropriate delivery of booking systems. It also
utilises the procedures of business management systems. Construction site
logistics also plans and integrates with the main contractors for meeting the
requirements of the planned program. Construction site logistics also performs
a range of other responsibilities that are essential for the smooth functioning
of the logistical processes. Without Construction site logistics, the
logistical process will never be successful and the purpose of logistics would
be lost. Other key responsibilities of Construction site logistics include
programme support, safety, site communications, fire, signage, delivery
arrangements, and transport of plant, equipment, vehicles, security, workfare,
environmental, corporate social responsibility and many more.
To be successful
in the world of construction logistics these things need to be considered and
implied effectively.
No comments:
Post a Comment